Pathway CH (Central Heating Installation and Maintenance Engineer EUSGU0 80)
Pathway CHG (Central Heating and Gas Fires Installation and Maintenance Engineer EUSGU0 81)
Pathway CHC (Central Heating and Cookers Installation & Maintenance Engineer EUSGU0 82)
Pathway CHA (Central Heating and Appliance Installation and Maintenance Engineer EUSGU0 83)
Pathway CHWA (Central Heating and Appliance (including Warm Air) Installation and Maintenance Engineer EUSGU0 84)
Pathway AIM (Appliance Installation and Maintenance Engineer EUSGU0 85)
Pathway AIWA (Appliance (Including Warm Air) Installation and Maintenance Engineer EUSGU0 86)
Pathway FCO (First Call Operative EUSGU0 75)